Customization: | Available |
---|---|
Type: | Ratchet Lashing |
Material: | Polyester |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
All Ratchet strap, must come with a label indicating size, maximum load, and WLL(working load limited). Remember, the WLL Is not the maximum load, always use the WLL when selecting ratchet strap. It Is the responsibility of the user to determine the number of straps needed to secure his load safety based on the WLL rule.
Europe Standard (EN12195-2):Working Load Limited (WLL) : Maximum Load : Webbing Max Capacity =1:2:3
American Standard (WSTDA-T-1): Working Load Limited (WLL) : Maximum Load -1:3
Webbing width | Lashing Capacity (daN) | CompleteSystem M.B.S(kg) | Fixed Length (m) | LC(daN) | LC(daN) | LC(daN) |
25mm | 400 | 800 | 0.3 | 400 | 800 | 800 |
25mm | 500 | 1000 | 0.3 | 500 | 1000 | 1000 |
25mm | 750 | 1500 | 0.3 | 750 | 1500 | 1500 |
35mm | 1000 | 2000 | 0.3 | 1000 | 2000 | 2000 |
35mm | 1500 | 3000 | 0.3 | 1500 | 3000 | 3000 |
50mm | 1500 | 3000 | 0.3 | 1500 | 3000 | 3000 |
50mm | 2000 | 4000 | 0.5 | 2000 | 4000 | 4000 |
50mm | 2500 | 5000 | 0.5 | 2500 | 5000 | 5000 |
75mm | 3500 | 7000 | 0.7 | 3500 | 7000 | 7000 |
100mm | 5000 | 1000 | 0.7 | 5000 | 1000 | 10000 |
FAQ:
Q: Can you do customers' styles?
A: Yes, just send us the drawing, then we could open a new mould for you to produce it as your request
Q: Can you send products to my country?
A: Sure, we can. If you do not have your own ship forwarder, we can help you.
Q: How do I pay?
A: We accept 30% payment in advance & 70% before shipment for the first cooperation, either by T/T or L/C.
Q: How Long Is Delivery?
A: Delivery time will be 30-45days according to order quantity
Q: How do you make quality control?
A: Each process and production line has QC to check the quality. It is in our control.